Quick Enquiry

Contact Info

How to Write a Construction Method Statement from Scratch

How to Write a Construction Method Statement from Scratch

A construction method statement is a document that lists the steps and procedures that will be used to finish a construction job safely and quickly. Here are some steps to take when starting from scratch to write a building method statement:

Specify the project’s goals, timeline, and budget: The first step is to clearly define the project’s goals, timetable, and budget.

Identify possible risks: Make a list of any risks that could come up during the job, such as using heavy equipment, working at heights, or being exposed to dangerous materials.

Determine safety measures: Decide on the safety measures that will be used to reduce any possible risks, such as personal protective equipment, safety hurdles, or training for workers.

Outline the construction process:  including the order in which tasks will be done and any dependencies between tasks.

Describe how each job will be built: including the materials, tools, and equipment that will be used.

Describe the quality control methods: that will be used to make sure the work is done to the required standards, such as inspections, testing, or documentation.

Identify waste management procedures: Figure out the waste management procedures that will be used to get rid of any waste materials, including dangerous ones, that are made during the building process.

Include emergency procedures: Include emergency procedures, like first aid, evacuation plans, and emergency reaction plans, in case of an accident.

Get the approvals you need: Before starting work, get any approvals you need from the local government, such as a building permit or an environmental permit.

Review and change as needed: During the project, review and change the construction method statement as needed to make sure it stays current and up to date.

In conclusion, writing a building method statement from scratch is an important task that needs careful planning and attention to detail. By following these steps, people who work in construction can make a detailed method statement that lists all the steps and procedures needed to finish the job safely and quickly.

Disclaimer: This content is provided solely for your review. Erusu Consultants takes no liability for this article. The reader is advised to form their own opinion. Please consult a structural engineer before making any final decisions.

Leave a Comment

Your email address will not be published. Required fields are marked *